Install membrane over entire floor first, then heating cable, then do the tiles 1 or 2 at a time. Never cover the Prodeso entirely with thin-set first. Only apply as much thin-set as needed to lay a couple of tiles at a time.
Did you find this helpful?
Yes
|
No