What type of floor preparation is required for Luxury Vinyl Tile (LVT) and radiant heating?

The subfloor will need to be prepared as per the instructions of the self-leveling cement (SLC) used. Please note that most self-leveling products require the use of a primer as specified by the SLC company.

7 people found this helpful.
Did you find this helpful? Yes | No