Struggling with the proper termination of self-regulating cables during a roof and gutter de-icing system installation? A poor seal can result in inefficient heating and potential weather damage. In this video, we address these concerns by demonstrating the correct termination process, ensuring a robust, weatherproof seal.
- Identifying the correct location for the final cut.
- Stripping back the outer jacket and preparing the cable.
- Applying and securing a two-inch length tube for waterproofing.
- Addressing the ground braid and ensuring good coverage.
- Using heat shrink tubing to create a reliable, adhesive-lined seal.
- Checking for a successful seal and final positioning of the wire.
This comprehensive guide is a valuable resource for both beginners and professionals looking to perfect their installation process. By following these steps, we ensure a safe, efficient, and long-lasting de-icing system. For more insights into roof and gutter de-icing solutions, visit our roof & gutter deicing system page.
All right, now we're coming to the point where we're going to make our end termination. We see we've got some extra wire here, so what we're going to do is determine the location for our final cut. It's important to remember that we're not just letting the wire dangle at the bottom; we will also double it back and secure it a bit higher. Therefore, our final cut will likely be made around this area.
Next, we need to strip the outer jacket back about four inches. After that, we will cut off the excess heater cable, leaving approximately one inch. To prepare the cable, we will cut a slit about 3/8 of an inch and then slightly spread the wires apart. At this point, we will slide a two-inch length of tube over the heater cable. While the cable is still warm, squeezing the end will help make this section waterproof. Once we have achieved that, we can cut off any excess tubing.
Now, we need to address the ground braid to cover the area we just worked on. We will take the three-inch tube and place it over the end of the cable. It is crucial to ensure that the heat shrink tube is positioned adequately on the cable to create a waterproof seal, while also leaving enough material to crimp the end closed. It appears we have good coverage at this stage.
Using our pliers, we will close off this end to ensure it is waterproof. If we take a closer look, we can see that this is not just any heat shrink tubing; it is actually adhesive-lined. A good seal can be identified by the black glue that seeps out of the tube onto the cable, indicating that we have achieved a reliable, weatherproof seal.
Now that we have a solid seal, we will run the wire up, ensuring it is facing upward into the tube. If you would like to know more information about roof and gutter de-icing, make sure to check us out online at www.warmlyyours.com.