Project Details
- Location: Sandpoint, ID
- Heated Space Type: Walkway
- Insulation Surface Area: 216 sq. ft.
- Heated Area: 180 sq. ft.
- System Power: 6,000Watts (6.0 kW)
- Voltage/Amperage: 240V / 25A
- Flooring: Concrete (new)
- Designed Cable Spacing: 3.0 inches
- Operating Cost Per Hour: $0.66
Automatic Snow Melting for Peace of Mind
The winter climate in Sandpoint, Idaho, can bring substantial snowfall, making maintaining clear access to the home a constant chore. Homeowner Nathan Dyk wanted a modern, reliable, and energy-efficient way to keep his main walkway safe and clear without the back-breaking work of manual shoveling or the corrosive impact of salt and chemicals. The decision was made to incorporate a WarmlyYours electric radiant heating system into the design of his new concrete walkway.
The installation utilized WarmlyYours Snow Melt Cable, which was secured to the rebar substructure of the walkway prior to the pouring of the new concrete. This placement ensures the heat is delivered directly to the surface, maximizing melting efficiency. The system is controlled by a Snow Melt Timer Control, which allows the homeowner to activate the system on demand or on a scheduled timer. The inclusion of a Small Relay Panel was necessary to safely handle the system’s 25 Amp load, ensuring reliable and code-compliant operation. The result is a permanently clear and safe heated walkway, providing comfort and peace of mind all winter long.
Featured Products
- WarmlyYours Snow Melt Cable (WHCA-240-0251): This heavy-duty, high-performance heating cable is designed for installation in concrete (new pour) and asphalt. It is the core of the system, providing reliable, energy-efficient heat to melt snow and ice upon contact.
- WarmlyYours Snow Melt Timer Control (SCM-DUAL): A simple-to-use control that allows the homeowner to activate the system manually or set a timed operation. This on-demand functionality prevents unnecessary energy consumption, increasing efficiency.
- Small Relay Panel (RLY-4PL-CC): Required to manage the high amperage draw of the $6.0$ kW system, this panel acts as an electrical interface between the control and the heating cables, ensuring the system operates safely and meets all NEC requirements.
- Snow Melt Plaque (NEC Requirement) (SMP): A necessary component for safety and code compliance, this plaque is installed near the control to clearly indicate the presence of the electric snow melting system.