SMG-U350 Frequently Asked Questions
Frequently Asked Questions
Showing all 9 questions
Yes. After the snow melting cable is installed, ensure that a minimum of 1.5" (Max 3") of non-combustible medium (concrete, mortar, stone) is placed on top.
Yes, your contractor would need to remove the existing tiles (if present) from the staircase and flatten the surface prior to installing the grid.
Start at the top and work your way down.
The grid could be attached with concrete screws and washers.
Cut a slit in the area of the lift or distortion to flatten it out.
It is recommended to install a screw every 1 sq ft to ensure the grid does not shift or distort when the heating cable is installed.
It is easiest to start on one end of the grid and pull the grid tight as you go working the way across.
Yes, it is important to ensure the grid is stretched taut in the same direction as the snow melting cable.
Once you've decided what type of heating system (manual vs. automatic), you'll need to choose a control, which may or may not utilize a sensor. You may need a relay panel(s) depending on the size of the system, and a snow melt plaque which is required by the National Electric Code. Junction box(es) may be optional depending on the distance of heating cable from the indoor power location.