Yes. After the snow melting cable is installed, ensure that a minimum of 1.5" (Max 3") of non-combustible medium (concrete, mortar, stone) is placed on top.

Was this helpful? Yes No

Yes, your contractor would need to remove the existing tiles (if present) from the staircase and flatten the surface prior to installing the grid.

Was this helpful? Yes No

Start at the top and work your way down.

Was this helpful? Yes No

The grid could be attached with concrete screws and washers.

Was this helpful? Yes No

Cut a slit in the area of the lift or distortion to flatten it out.

Was this helpful? Yes No

It is recommended to install a screw every 1 sq ft to ensure the grid does not shift or distort when the heating cable is installed.

Was this helpful? Yes No

It is easiest to start on one end of the grid and pull the grid tight as you go working the way across.

Was this helpful? Yes No

Yes, it is important to ensure the grid is stretched taut in the same direction as the snow melting cable.

Was this helpful? Yes No