Contact Us Open

Loading...

Loading contact options...

Sign In

Loading...

Loading...



Snow Melt PowerMat 120V, 2 x 10 ft., 20 sq.ft., 8.33A - Refurbished



  • Maximum Heat Output: Approximately 50-watts per sq. ft with 3″ cable spacing for fastest snow melting
  • Best for Heavy Snowfall: Recommended for regions with 60+ inches of annual snowfall or when rapid melting is critical
  • Even Heating: Pre-attached heating elements in a serpentine pattern with consistent 3″ spacing ensures uniform coverage
  • Fast and Easy Installation: Cut-and-turn design makes installation faster than cables while providing maximum heat density
  • Installation Support: Free SmartPlan™ installation plans, 24/7 phone support, and a 10-year limited warranty

Get an Instant Quote

Snow Melt PowerMat Description

Eliminate the risk of falls on snowy or icy surfacesby adding a WarmlyYours snow melting system to your home or business. With20 ft² of radiant heat to efficiently melt snow and ice, the 2 x10 ft. 120 V snow melting mats are composed of a durable,corrosion-resistant, twin-conductor heating element affixed to a polypropylenemesh backing for even distribution of heat in asphalt, concrete or mortarunderneath paver applications. 

Safe, CSA certified, for outdoor use in the U.S. andCanada, WarmlyYours snow melting mats generate 50 watts persquare foot for optimal snow melting performance. A 20-foot (6m) cold lead is included to adapt to yourinstallation requirements.

Specifications

Electrical

Amps 8.33 A
Ohms 14.4 Ω
Voltage 120 V
Watts 1000 W
Watts Per Sq. Ft. 50

Warranty / Certifications

Approvals cCSAus Listed
Warranty 10 years

Performance

BTU Per Hour 3412 Btu
Heated Coverage 22.5 ft²

Product Dimensions

Cold Lead Length 20′
Coverage 20 ft²
Depth 10′
Heating Element Spacing 3″
Heating Element Thickness 5/16″
Height 5/16″
Length 10′
Size 2′ x 10′
Size and Power 2x10 ft - 50 W/sq.ft.
Weight 6.4 lbs
Width 2′

Appearance

Color Green

Identifiers

Product Line Name PowerMat
SKU WHMA-120-0210-BTK
UPC (GTIN-12) 881308073152

Installation

Surface Types Asphalt, concrete or in mortar under pavers

Logistics

UNSPSC Code 40101842

Installation Plans

This is a real example of an installation plan that uses this product. If you want to design your own room or have any questions, please contact us.

Architectural installation plan diagram for a snow melting system showing zoned heating mat layouts on stairs and driveway sections.
Flooring
Concrete (new) Subfloor
N/A Voltage
240V Operating Cost
341 cents per hour

This Installation Plan Includes:


Frequently Asked Questions

Showing all 5 questions

Power requirements are measured in Amps and based on three factors: the watts per sq. ft. of the snow melting cable or mat, the area powered and the voltage used for the application. Our PowerMat product is rated at approximately 50 watts per sq. ft. (with 3" cable spacing), so that is a constant factor. Most snowmelt projects are powered with 240V AC – not all, but most. The one factor that is always variable is the area to be heated/powered. That is based on your project. For a point of reference, let's use the example of a 350 sq. ft. concrete patio.

The formula is (50 W/sq. ft. x area of 350 sq. ft.) / V (240V) = Amps, so 17,500 / 240V = 72.9 Amps

9 people found this helpful Was this helpful? Yes No

That depends on a number of variables (like the temperature outside) but generally speaking these snow melting systems are designed to melt 1" - 3" of snow per hour. Anything above 3" per hour is typically considered blizzard conditions. 

25 people found this helpful Was this helpful? Yes No

Never cut the heating cable. A heating cable will not work if it has been cut. If the heating cable is too long, call WarmlyYours to consult with a technician who will guide you in utilizing the additional length of cable.

18 people found this helpful Was this helpful? Yes No

The material costs are similar. However, electric systems are easier to install, with fewer components and significantly lower maintenance costs. Electric systems will run for a shorter period of time to give the same level of performance but with much higher energy efficiency (typically 95%-98% efficient). Controls and sensors required for the two types of systems are very similar. Electric systems do not usually require slab insulation and do not create the concerns typically associated with hydronic systems. These concerns include, but are not limited to, return temperatures, flue gas venting, waterway shrinkage and property damage caused by leaking pipes or tubes.

15 people found this helpful Was this helpful? Yes No

When installing outdoor WarmlyYours snow melting cables for your driveway, patio, walkway, terrace, stairs, ramp, etc. - NEVER cross, overlap, or allow the heating cables to touch each other. Doing so will quickly cause a circuit failure due to excessive heat build up. Always follow the installation instructions and/or design layout plan to ensure the cable is installed with the correct spacing required for proper operation.

14 people found this helpful Was this helpful? Yes No

Customer Reviews